How To Overcome Site Constraints on Construction Developments

There are several different site constraints in construction. The most efficient businesses are those that find effective solutions and approaches to overcome these constraints so that their productivity levels don’t suffer. Considering that, we have put this guide together to give you some information and advice on some of the different steps that you can take to overcome site constraints on construction developments. This includes the following:

Design Your Project Around Energy Efficiency

Firstly, there is no denying that a large quantity of energy is used by the construction industry to manufacture materials and create buildings. Wind power, hydropower, nuclear power, and fossil fuels represent some of the most common sources of energy used today. When the chief energy sources used are not renewable, it results in an excess of carbon dioxide emissions. This is why it’s a good idea to ensure your project is designed around energy efficiency. Whenever possible, try to use renewable energy resources, with examples including the likes of wind turbines and solar power. Creating more sustainable practices will help you reduce site constraints both now and in the future.

Use Light Gauge Steel Framing to Reduce Site Constraints

One of the ways that you can effectively reduce construction site constraints is by using a light gauge steel frame. Known for their durability and strength, you have a product that can reduce a lot of the constraints that construction businesses tend to face. One of the main reasons for this, is because these frames are manufactured and built off-site, which delivers a great quality product while also lowering the number of visits needed to the site. Construction time will also be greatly reduced. This material is lightweight and much easier to handle. When compared with traditional building methods, it’s predicted that construction build time can be reduced by as much as 40 per cent.

Put Together a Plan for Dealing with Waste and Materials

Finally, during construction, a large quantity of waste is produced throughout a construction project because of the sheer number of materials that are utilised. Waste includes roofing materials, paint, glass, metals, non-ferrous and ferrous, asphalt, lead pipes, plastic, concrete, insulation, wood, and tiles. This waste contributes to more waste in landfills, which can have a devastating impact on the environment. This is why we recommend that you plan for potentially hazardous waste and have an effective disposal plan. Aside from this, it’s important to purchase building materials that are sourced sustainably. You can also make improvements at your site in terms of improved water conservation and water management, for example, landscaping that is drought tolerant.

As you can see, there are several different steps you can take when it comes to reducing the constraints on your building site. Putting together a site constraints plan, which includes the use of light gauge steel modular construction, can help you to run your project as efficiently as possible so that you do not have to worry about being held back.

Looking For The Right Solution? Read Our Guide to See How Light Steel Frame Technology Can Increase Your Workforce's Productivity and Reduce Your Build Programme

Would light gauge steel load bearing work for your construction project? Find out how load bearing eliminates site constraints by checking out our guide here.

Alternatively, if you would like to find out more about light gauge steel framing and how it can benefit your construction projects, get in touch with a member of the Frameclad team by using our quick and easy contact form below. You can also contact a member of our team today on 01384 401 114 or by emailing us at enquiries@frameclad.com. We look forward to hearing from you.